Kwun Tong Methodist Kindergarten
完工相片







Renovation of Main Gate, Hall Signage, and Replacement of Activity Room/Hall Vinyl Flooring
- LED embossed sign
- Arc-shaped waterproof shell with integrated LED strip light, LED track lights, and decorative shaped waterproof trim
Glass main door with outdoor baked-enamel frame and frosted sticker
- Anti-slip floor tiles and vinyl flooring with self-leveling compound
- Small hall storage room partition with concealed wooden door (fire-rated laminate finish)
- Wooden cross
Year
2023